    1. The LNG stations mainly include , LNG storage tanks, LNG/L-CNG pump, high pressure vaporizer, air cylinder group, sequential   control plate, LNG charging machine, CNG dispenser , storage tanks and connecting line;

    2. LNG/L-CNG pump install on skid ;

    3. CNG storage cylinder install on skid ;

     4.Storage system uses 

     The following specification

     Follow the following standards :

    · <<Liquefied natural gas (LNG) car LNG stations technical specification>> NB/T 1001-2011

    · <<The explosion and fire dangerous environment electrical device design specification>>GB50058-92

    · <<Automatic fire alarm system design specifications>>GBJ116-88

    · <<Explosive dangerous location electrical installation procedures of the People's Republic of China>>GBJ16-87

    · <<Low voltage power distribution design specification>>GB50054-95

    · <<Standard of lighting design of industrial enterprises>>GB50034-92

    · <<Urban gas design specifications>>GB50028-2006

    · <<Design and construction of gas stations>>GB50156-2006

    · <<vehicles CNG>>GB18047-2000

    · <<Electrical equipment used in explosive gas environment Part 1 general requirements>>GB3836.1-2000

    · <<Electrical equipment used in explosive gas environment Part 2 flameproof "d" >>GB3836.2-2000

    · <<Cryogenic liquid road tankers>>JB/T6897-2000

    · <<vehicle fuel system standards>>NFPA57(reference) 

     Process description:

    Unloading process:LNG LORRY—Unloading booster—LNG Storage tank

    From LNG liquefaction plant ,Using  low temperature transporting LNG tank lorry transported to LNG station, unloading interface by LPG stations. the supercharger  press the LNG to LNG stations to the low temperature storage tank

     

    LNG filling process:LNG storage tank—LNG cryogenic tank—LNG dispenser—LNG car

    Filling  for the car. firstly ,connect the LNG nozzle with the car LNG cylinder .under the press of the cryogenic pump ,the LNG will flow through the pipeline to the LNG dispenser ,then flow into the mass flow meter of the dispenser , the flow meter will calculate how much liquid by pass .the amount will display on controller panel.